John Curtin College Music Building
John Curtin College Music Building was split into a 3 building construction project. The build consisted of the west block, which overlooked the Fremantle Harbour, housing two Orchestra rooms, east and south block, which facilitated stem design, percussion, staffrooms, Film and TV with associated control and audio control room, music, general learning areas and various practice rooms.
Construction was carried out between February 2024 and May 2025. The Structure consisted of exposed aggregate finish, precast concrete panels, which was the highlight of the project and structural steel roof structure. The internal finishes varied with the use of numerous acoustic treated wall coverings and operable doors enabling the spaces to be used for different music functions.
Access to the project was limited, with access through a laneway between an existing theatre block and a working prop shed. The main way of achieving the constructability was the use of a tower crane to crane all the materials into situ or the courtyard to enable the construction activities.
The project was a great success and was a great team achievement from all involved from the Design team through to the Construction Team enabled by a very accommodating school.
CLIENT:
DEPARTMENT OF FINANCE – BMW
ARCHITECT:
TAYLOR ROBINSON CHANEY BRODERICK