PS Structures was engaged on a Design and Construct basis by international truck tail lift company Dhollandia Pty Ltd for the purpose of establishing a facility in Western Australia; having previously purchased spec-built properties elsewhere in Australia.

The Dhollandia Warehouse project comprised of a design to the client’s requirements whilst traversing difficult conditions imposed by the local authority and a stormwater easement that was located at the rear of the property. The new facility comprised of a double storey office, a workshop/warehouse which was split into two tenancies and divided by 11m high concrete panel walls. A second smaller office was constructed internally of the second tenancy for future leasing by the client. A concrete hardstand and bitumen parking comprising of 52 car bays with a complex civil storm water drainage system was designed and built to accommodate council requirements given the high ground water experienced in the Kewdale/Belmont areas in Perth. As no sewer service was available to this property, waste treatment services were design and constructed to suit occupational requirements referenced in Australian Standards, the National Construction Code and local authority conditions.

Building composition to the workshop/warehouse included full height concrete tilt up walls installed along the boundary and warehouse with dividing walls for fire containment. Concrete dado panels and steel structure clad with colourbond Trimdek sheets to the eastern elevation and roof; was fitted out with a gantry crane, compressed air line system and power outlets to Dhollandia’s specification. The double storey office to the front tenancy was constructed via a combination of materials and methods; primarily concrete tilt up panel walls and concrete blockwork to support the first-floor deck. The second tenancy’s office to the rear warehouse was constructed from concrete blockwork; with a concrete deck installed above for future development by the prospective tenant. Being positioned under the flight path of Perth Airport’s main runway, stringent measures were employed from an acoustic perspective into both design and the construction of this premises.  

A native garden and green lawns were planted at the facility’s entry, to local council requirements and the satisfaction of the client. PS Structures were delayed by the local authority in being granted a building permit to undertake the works given its proximity to existing council infrastructure, however, were still able to complete the design and construction within the contract time frames. This allowed the client to commence their operations from the facility as planned; the delay negated by PS Structure’s dedication to providing a quality product on time.

CLIENT:
DHOLLANDIA AUSTRALIA PTY LTD

ARCHITECT:
MEYER SHIRCORE & ASSOCIATES