Education
Kelmscott Senior High School Upgrade and New Farm Building
This project consisted of 3 separate construction areas. 1. Refurbishment of math area and staff room. 2. Extension of the science building with two new science laboratories and computer room in traditional brick construction, with Colorbond roof. 3. Construction of a new farm building. Steel framed construction with colourbond roof and walls built from polystyrene, metal clad panels. The building incorporates milking and sheep shearing demonstration areas.
Perth College New Science Wing
Construction of a new three storey, reinforced concrete science wing for Perth College, with a very constricted site, access was only available from the southern side. An innovative method of retaining wall construction was used to ensure a minimum amount of vibration was placed upon the adjacent swimming pool and houses.

